亚州激情中文字幕_午夜男女无遮挡拍拍流水视频_两个人在线观看视频bd_欧美日韩国产第1页_高H喷水荡肉爽免费视频_免费A级毛片无码鲁大师_亚洲综合日韩专区在线_亚洲欧美韩国综合_卡一卡二卡三专区免费_久久精品一二三四区影院

Welcome to Hunan Zhengyang Photoelectric Technology Co. Ltd!

中文| English

Project cooperation

Home> Project cooperation

Project operation process

Project operation process
employment objectivejob contentExecutive department
Preparatory stage

Through the newspaper network exhibition and other media to do the company's advertising

Market advertising department

Find target customersInitiate and participate in customer follow-up for lighting engineering with strong demand and affordability

Market development department

Understand customer needsAnalysis of the target building drawing - understanding the architectural designer's intentProject planning department

Effect design department


Project Department
Communicate with the structural engineer to understand the architectural features
Communicate with electrical engineer to understand distribution load

Field reconnaissance of the project, the overall environment of photography, and some pictures to ensure completion of the building after the completion of the project / lighting effect in harmony with the surrounding environment


Seek advice from customers and related departments / reference for follow-up work.
Analyze customer requirementsAnalyze customer requirements for the project
Analyze the performance requirements of designers and customers
Analysis of the characteristics of the project structure - the full use of favorable factors
Analysis of the surrounding environment, major roads and traffic flow direction
Analysis of the main view of the people around the building
Organize / summarize / study the information collected on the site - sketch
Interim Design StageAccording to the standard of urban building flood lighting, combined with the integration of general lighting and individual lightingEffect design department



Combining the advanced lighting concept with power economy

The combination of night lighting and daytime environment

Calculation of different parts of the building illumination / light / color temperature / color

Choose a reasonable lighting: LED/ floodlight

Interior lighting / dynamic lighting highlights green lighting

The simulation results of different schemes are designed according to the parameters such as elevation / illuminance / light / color temperature / color and so on
Submission of drawingsPlanning plan / overall effect map / local renderings / functional zoning map

Electrical drawings / construction scheduleProject Department
Submission of documentsDescription of the plan, reasonable investment estimation, electrical design requirementsProject budget department
Scheme determinationCustomer feedback / further refinement / implementationProject planning department



Later work contentFive points design, construction of five pointsProject planning department
Prior to constructionInsured property / personal accident insurance, to ensure that the interests of customers are not compromisedProject finance department
During constructionStrictly follow the ISO90001 quality management systemProject planning department

Conscientiously implement the construction specifications and process standardsProject Department
Final acceptance handoverSubmit a complete set of construction and acceptance program text to customer

Responsible for the relevant personnel training system
Service maintenanceProject free warranty period of one year / regular return visitCustomer service department

Once a year, the commissioning of lamps and cleaning servicesEngineering maintenance department

All-weather response to customer service needsCustomer service department